SE 491 Design Project 2
Software Engineering (2009-2010)

Final implementation, testing, and communication of the design project started in SE 390. Preparation of a detailed test document. Technical presentations by groups. Final release of the project. Project retrospective. [Offered: W]
Prerequisites: SE 490; Software Engineering students only

Sections For Fall 2009

SE 491 is not held in Fall 2009

Sections For Spring 2009

SE 491 is not held in Spring 2009

Professors That Have Taught SE 491