SE 491 Design Project 2Software Engineering (2009-2010)
Final implementation, testing, and communication of the design project started in SE 390. Preparation of a detailed test document. Technical presentations by groups. Final release of the project. Project retrospective. [Offered: W]
Prerequisites: SE 490; Software Engineering students only
Sections For Fall 2009
SE 491 is not held in Fall 2009
Sections For Spring 2009
SE 491 is not held in Spring 2009